CDU Project Specification

For Vendor Quoting & Feasibility Assessment

Property
334 Twining Flats Rd, Aspen, CO 81611
County
Pitkin County, Colorado
Owner
Jon Deutser — jondd@att.net / 713-898-6744
Date
April 5, 2026
Prepared by
Nick Gray

1. Project Summary

We are looking to add a prefabricated Caretaker Dwelling Unit (CDU) on a mountain property near Aspen, CO. Pitkin County has confirmed the CDU is allowed, with a maximum of 1,000 sq ft of living area total across all free-standing structures. The county looks favorably on pre-manufactured/modular structures. We are seeking quotes from vendors who can deliver a unit to this site — 2BR/2BA minimum, 3BR/2BA preferred.

2. Site Conditions

Elevation7,296–7,318 ft (per topographic survey by Aspen Survey)
Terrain~20 ft elevation change across property (slopes west to east)
Build locationRoad-side (west) of property, within defined Activity Envelope, 15–20 yards from road
Current conditionBare land — no existing foundation or pad at proposed build location
ExposureUnsheltered — full exposure to weather and snow
Water featureRoaring Fork River along east boundary — 100 ft stream setback (CDU will be on opposite side)
Lot size~2.23 acres (AR-10 zone, legally non-conforming/grandfathered)
Existing structures2-story wood frame house (~2,108 sq ft), shed, gravel parking area

3. Structure Requirements

Size & Layout

Total living area1,000 sq ft maximum (county-mandated CDU cap)
Bedrooms2 minimum, 3 desired. Please provide floor plans for both. If 3BR requires dropping the living room, show us that option.
Bathrooms2 full (minimum)
KitchenNon-negotiable — must have a kitchen. Full kitchen or kitchenette acceptable, but cannot be removed to gain a bedroom.
PorchFront porch desired
GarageNot part of this project (separate structure, separate budget)

Design & Aesthetic

StyleMountain modern
RoofSlanted/pitched only — no flat roofs. Standing seam metal preferred.
Aesthetic matchingNot required to match existing primary residence
Interior finish levelMid-grade

Engineering Requirements

Snow loadMust be rated for 80–100+ PSF ground snow load (Pitkin County mountain site at ~7,300 ft)
Wind loadPer Pitkin County building code
Energy code2021 IECC
Frost protection36 inches
Outdoor design temp-16°F
Ice dam barrierRequired — must extend 4.5 ft inside exterior wall line
Roof coveringClass A minimum
Building code2021 ICC codes with Pitkin County amendments

Construction & Delivery

Construction typeIRC/IBC modular strongly preferred (not HUD-code manufactured)
Colorado approvalMust carry Colorado Division of Housing insignia or be approvable in Colorado
Delivery methodMulti-module or panelized acceptable
FoundationVendor should recommend type based on site slope and soil conditions
Heating systemFlexible — vendor's recommendation for this site and budget

4. Existing Utilities

WaterWell on property (Basalt Water Conservancy District). Capacity TBD — new well may be needed.
ElectricityAvailable on-site
SepticExisting system for primary residence. New septic required for CDU.
GasNatural gas confirmed on property — can be routed to CDU
InternetAvailable on property

5. What We Need From You

  1. Feasibility confirmation — Can you deliver to a narrow mountain road with a very tight turnaround near Aspen?
  2. Colorado approval status — Do you carry CO Division of Housing insignia, or can you obtain it?
  3. Snow load engineering — Can your structure be engineered for 80–100+ PSF ground snow load?
  4. Itemized quote — Structure cost separate from site work, foundation, delivery, and installation
  5. Floor plan options — 2BR/2BA and 3BR/2BA configurations within 1,000 sq ft, with pitched roof. If 3BR requires trading the living room, show us that layout.
  6. Timeline estimate — From order to delivery-ready
  7. Scope of work — What do you handle (turnkey) vs. what requires a local GC?

6. Property Photos

Existing primary residence and surroundings — click to enlarge.

Additional Information

Reference detail on permitting, zoning, and county contacts — useful for accurate quoting and timeline planning, not required to start the conversation.

Permitting Context

Dimensional Requirements (AR-10 Zone)

Max height — accessory structure20–21 ft to ridge; 12 ft to eave
Front setback30 ft (lots ≤ 3 acres)
Side setback20 ft
Rear setback30 ft
Stream setback100 ft (Roaring Fork River)
Floor area budget remaining~3,642 sq ft of 5,750 max (after existing house)

County Contacts

Planner of the Day970-429-6108 / planneroftheday@pitkincounty.com
Builder of the Daybuilderoftheday@pitkincounty.com
OWTS / Septic (Bryan Daugherty)970-319-3799
Community Development970-920-5526
Permit systemsagesgov.com/pitkincounty-co
Little Annie CDU Project — Vendor Specification Sheet — April 2026
Questions: Contact Jon Deutser at jondd@att.net or 713-898-6744